Nationwide Building Society – Office

This project was a partial strip-out, refurbishing existing M&E services and installing new services to suit the new office.

We carried out the full suite of M&E services including Lighting, Small Power, Air-Conditioning, Water Services and Ventilation.

We carried out a full system health check on the existing AC system and extended/added to this to suit the new layouts.

This was a fast-track project completed in 16 weeks and was a full Design and Build for AMD carried out on an existing framework.

Added value: Our D&B expertise allowed this project to be delivered quickly and co-ordinated during the design phase which saved time on site.

Project value

£500k

Location

Dunfermline, Scotland

TIMESCALE

16 weeks

SERVICES

Mechanical & Electrical